HIT-HY 200-A V3 / HIT-HY 200-R V3
Original Operating Instruction
Information about the documentation
About this documentation
- Read this documentation before initial operation or use. This is a prerequisite for safe, trouble-free handling and use of the product.
- Observe the safety instructions and warnings in this documentation and on the product.
- Always keep the operating instructions with the product and make sure that the operating instructions are with the product when it is given to other persons.
Product selection
Procedure
Use arrows to make a selection or obtain more information.This online manual is updated and improved frequently. Any suggestion or feedback? Please share it with us at instructions@hilti.com
(Version: 2021-12-17)
Safety
Safe Handling
Special instructions for the use of HIT-Z:Basic Information
Intended Use
Adhesive anchoring system for rebar and anchor fastenings in concrete.
Symbols on the Product
SymbolsAttention! |
Wear eye protection |
||
Very toxic to aquatic life with long lasting effects! |
Wear protective gloves |
||
Read instructions |
Wear protective clothing |
Ingredients
Contains hydroxypropylmethacrylate: May cause an allergic skin reaction.Contains 1,4 Butandiol-dimethacrylat: May cause an allergic skin reaction.
Contains dibenzoyl peroxide: May cause an allergic skin reaction. Causes serious eye irritation. Very toxic to aquatic life with long lasting effects.
Contains 2,2‘-(m-tolylimino)diethanol: May cause an allergic skin reaction.
Disposal considerations
Empty packs: Leave the mixer attached and dispose of via the local Green Dot recovery system or EAK waste material code: 150102 plastic packagingFull or partially emptied packs: Must be disposed of as special waste in accordance with official regulations. EAK waste material code: 08 04 09* waste adhesives and sealants containing organic solvents or other dangerous substances. or EAK waste material code: 20 01 27* paint, inks, adhesives and resins containing dangerous substances.
Product information
Failure to observe these installation instructions, use of non-Hilti anchors, poor or questionable concrete conditions, or unique applications may affect the reliability or performance of the fastenings.- Always keep these instructions together with the product even when given to other persons.
- Only pass the product on to other persons together with the instructions for use.
- Safety Data Sheet: Review the Safety Data Sheet before use.
- Check expiration date: See imprint on foil pack manifold (month/year). Do not use expired product.
- For any application not covered by this document / beyond values specified, please contact Hilti .
- Partly used foil packs must remain in the cassette and has to be used within 4 weeks. Leave the mixer attached on the foil pack manifold and store within the cassette under the recommended storage conditions. If reused, attach a new mixer and discard the initial quantity of anchor adhesive.
Safety Notes
- Personal protective equipment → Wear protective gloves, protective clothing, eye protection, face protection.
- Do not get in eyes, on skin or on clothing.
- IF ON SKIN: Wash with plenty of soap and water.
- IF IN EYES: Rinse cautiously with water for several minutes. Remove contact lenses, if present and easy to do. Continue rinsing.
- If skin irritation or rash occurs: Get medical advice/attention.
- If eye irritation persists: Get medical advice/attention.
- In order to obtain a safe application, be sure to observe the specifications and instructions regarding the drill hole, base material, cleaning and installation. You will find these in detailed form on the Internet .
Product page and Print
On the product page you will find more information about HIT-HY 200-R V3, HIT-HY 200-A V3, as well as the printed version of these instructions._______________________________________________________________________________________________________________________________________
Product Selection
Select the Parameters
HIT-HY 200-A V3 - Base material
→ cracked and uncracked Concrete→ Grout-filled CMU
HIT-HY 200-A V3 - Concrete
Select Anchor HIT-HY 200-A V3 - Concrete → HIT-Z________________________________________________________
→ HIT-V / HAS / HAS-U / HAS-E
________________________________________________________
→ HIS-N
________________________________________________________
→ Rebar
HIT-HY 200-A V3 - Grout-filled CMU
Select Anchor HIT-HY 200-A V3 - CMU → HIT-Z________________________________________________________
→ HIT-V / HAS / HAS-U / HAS-E
________________________________________________________
→ HIS-N
________________________________________________________
→ Rebar
Select Anchor HIT-HY 200-A V3 - Concrete
→ HIT-Z________________________________________________________
→ HIT-V / HAS / HAS-U / HAS-E
________________________________________________________
→ HIS-N
________________________________________________________
→ Rebar
Select Anchor HIT-HY 200-A V3 - CMU
→ HIT-Z________________________________________________________
→ HIT-V / HAS / HAS-U / HAS-E
________________________________________________________
→ HIS-N
________________________________________________________
→ Rebar
HIT-Z - HIT-HY 200-A V3 - Concrete
→ floor and downwardly inclined installation________________________________________________________
→ horizontal and upwardly inclined installation
________________________________________________________
→ back to product selection
HIT-Z - HIT-HY 200-A V3 - CMU
→ floor and downwardly inclined installation________________________________________________________
→ horizontal and upwardly inclined installation
________________________________________________________
→ back to product selection
HIT-V / HAS-U - HIT-HY 200-A V3 - Concrete
→ floor and downwardly inclined installation________________________________________________________
→ horizontal and upwardly inclined installation
________________________________________________________
→ back to product selection
HIT-V / HAS-U - HIT-HY 200-A V3 - CMU
→ floor and downwardly inclined installation________________________________________________________
→ horizontal and upwardly inclined installation
________________________________________________________
→ back to product selection
HIS-N - HIT-HY 200-A V3 - Concrete
→ floor and downwardly inclined installation________________________________________________________
→ horizontal and upwardly inclined installation
________________________________________________________
→ back to product selection
HIS-N - HIT-HY 200-A V3 - CMU
→ floor and downwardly inclined installation________________________________________________________
→ horizontal and upwardly inclined installation
________________________________________________________
→ back to product selection
Rebar - HIT-HY 200-A V3 - Concrete
→ floor and downwardly inclined installation________________________________________________________
→ horizontal and upwardly inclined installation
________________________________________________________
→ back to product selection
Rebar - HIT-HY 200-A V3 - CMU
→ floor and downwardly inclined installation________________________________________________________
→ horizontal and upwardly inclined installation
________________________________________________________
→ back to product selection
HIT-Z - floor and downwardly inclined installation - HIT-HY 200-A V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-Z - floor and downwardly inclined installation - HIT-HY 200-A V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-V / HAS-U - floor and downwardly inclined installation - HIT-HY 200-A V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-V / HAS-U - floor and downwardly inclined installation - HIT-HY 200-A V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIS-N / HIS-RN - floor and downwardly inclined installation - HIT-HY 200-A V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIS-N / HIS-RN - floor and downwardly inclined installation - HIT-HY 200-A V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
Rebar - floor and downwardly inclined installation - HIT-HY 200-A V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
Rebar - floor and downwardly inclined installation - HIT-HY 200-A V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-Z - horizontal and upwardly inclined installation - HIT-HY 200-A V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-Z - horizontal and upwardly inclined installation - HIT-HY 200-A V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-V / HAS-U - horizontal and upwardly inclined installation - HIT-HY 200-A V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-V / HAS-U - horizontal and upwardly inclined installation - HIT-HY 200-A V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIS-N / HIS-RN - horizontal and upwardly inclined installation - HIT-HY 200-A V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIS-N / HIS-RN - horizontal and upwardly inclined installation - HIT-HY 200-A V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
Rebar - horizontal and upwardly inclined installation - HIT-HY 200-A V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
Rebar - horizontal and upwardly inclined installation - HIT-HY 200-A V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIS-N - floor and downwardly inclined installation - Diamond Core Drill with roughening Tool - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIS-N - floor and downwardly inclined installation - Diamond Core Drill with roughening Tool - HIT-HY 200-R V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIS-N - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ back to product selection
HIS-N - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-A V3 - CMU
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIS-N - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-R V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIS-N - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-R V3 - CMU
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIS-N - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIS-N - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-A V3 - CMU
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIS-N - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-R V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIS-N - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-R V3 - CMU
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIS-N / HIS-RN - horizontal and upwardly inclined installation - Diamond Core Drill with roughening Tool - HIT-HY 200-A V3 - Concrete
Application- HIS-N / HIS-RN
- horizontal and upwardly inclined installation
- Diamond coring with roughening with Hilti roughening tool TE-YRT
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of Installation
→Roughening Time
→HIS-N / HIS-RN / Diamond core bit [metric units]
Perform Installation
→HIS-N / HIS-RN / Diamond core bit [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIS-N / HIS-RN - horizontal and upwardly inclined installation - Diamond Core Drill with roughening Tool - HIT-HY 200-R V3 - Concrete
Application- HIS-N / HIS-RN
- horizontal and upwardly inclined installation
- Diamond coring with roughening with Hilti roughening tool TE-YRT
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of Installation
→Roughening Time
→HIS-N / HIS-RN [imperial units]
Perform Installation
→HIS-N / HIS-RN [imperial units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIS-N / HIS-RN - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-A V3 - Concrete
Application- HIS-N / HIS-RN
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation
→HIS-N / HIS-RN [imperial units]
→HIS-N / HIS-RN [metric units]
Perform Installation
→HIS-N / HIS-RN [imperial units]
→HIS-N / HIS-RN [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIS-N / HIS-RN - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-A V3 - CMU
Application- HIS-N / HIS-RN
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- CMU
- Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation
→HIS-N / HIS-RN [imperial units]
Perform Installation
→HIS-N / HIS-RN [imperial units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIS-N / HIS-RN - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-R V3 - Concrete
Application- HIS-N / HIS-RN
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation
→HIS-N / HIS-RN [imperial units]
→HIS-N / HIS-RN [metric units]
Perform Installation
→HIS-N / HIS-RN [imperial units]
→HIS-N / HIS-RN [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIS-N / HIS-RN - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-R V3 - CMU
Application- HIS-N / HIS-RN
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- CMU
- Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation
→HIS-N / HIS-RN [imperial units]
Perform Installation
→HIS-N / HIS-RN [imperial units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIS-N / HIS-RN - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-A V3 - Concrete
Application- HIS-N / HIS-RN
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling
→HIS-N / HIS-RN [imperial units]
→HIS-N / HIS-RN [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
Perform Installation
→HIS-N / HIS-RN [imperial units]
→HIS-N / HIS-RN [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIS-N / HIS-RN - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-A V3 - CMU
Application- HIS-N / HIS-RN
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- CMU
- Dry Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling
→HIS-N / HIS-RN [imperial units]
Perform Installation
→HIS-N / HIS-RN [imperial units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIS-N / HIS-RN - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-R V3 - Concrete
Application- HIS-N / HIS-RN
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling
→HIS-N / HIS-RN [imperial units]
→HIS-N / HIS-RN [metric units]
Perform Installation
→HIS-N / HIS-RN [imperial units]
→HIS-N / HIS-RN [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIS-N / HIS-RN - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-R V3 - CMU
Application- HIS-N / HIS-RN
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- CMU
- Dry Concrete
Transport and Storage Temperature |
5 ℃ … 25 ℃ (41 ℉ … 77 ℉) |
Foil pack temperature during usage |
0 ℃ … 40 ℃ (32 ℉ … 104 ℉) |
Base material temperature at time of installation |
−10 ℃ … 40 ℃ (14 ℉ … 104 ℉) |
→ return to previous page with "back"-function of your browser |
→Auxiliary Means [imperial units]
→Order Numbers
Hole Drilling
→HIS-N / HIS-RN [imperial units]
Perform Installation
→HIS-N / HIS-RN [imperial units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V - floor and downwardly inclined installation - Diamond Core Drill with roughening Tool - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-V - floor and downwardly inclined installation - Diamond Core Drill with roughening Tool - HIT-HY 200-R V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-A V3 - CMU
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-R V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-R V3 - CMU
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-A V3 - CMU
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-R V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-R V3 - CMU
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-V / HAS-U / HAS-E / HAS - horizontal and upwardly inclined installation - Diamond Core Drill with roughening Tool - HIT-HY 200-A V3 - Concrete
Application- HIT-V / HAS-U / HAS-E / HAS
- horizontal and upwardly inclined installation
- Diamond coring with roughening with Hilti roughening tool TE-YRT
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of Installation
→Roughening Time
→HIT-V / HAS-U / HAS-E / HAS / Diamond core bit [imperial units]
→HIT-V / HAS-U / HAS-E / HAS / Diamond core bit [metric units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS / Diamond core bit [imperial units]
→HIT-V / HAS-U / HAS-E / HAS / Diamond core bit [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V / HAS-U / HAS-E / HAS- horizontal and upwardly inclined installation - Diamond Core Drill with roughening Tool - HIT-HY 200-R V3 - Concrete
Application- HIT-V / HAS-U / HAS-E / HAS
- horizontal and upwardly inclined installation
- Diamond coring with roughening with Hilti roughening tool TE-YRT
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of Installation
→Roughening Time
→HIT-V / HAS-U / HAS-E / HAS / Diamond core bit [imperial units]
→HIT-V / HAS-U / HAS-E / HAS / Diamond core bit [metric units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS / Diamond core bit [imperial units]
→HIT-V / HAS-U / HAS-E / HAS / Diamond core bit [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V / HAS-U / HAS-E / HAS - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-A V3 - Concrete
Application- HIT-V / HAS-U / HAS-E / HAS
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V / HAS-U / HAS-E / HAS - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-A V3 - CMU
Application- HIT-V / HAS-U / HAS-E / HAS
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- CMU
- Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V / HAS-U / HAS-E / HAS - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-R V3 - Concrete
Application- HIT-V / HAS-U / HAS-E / HAS
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V / HAS-U / HAS-E / HAS - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-R V3 - CMU
Application- HIT-V / HAS-U / HAS-E / HAS
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- CMU
- Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V / HAS-U / HAS-E / HAS - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-A V3 - Concrete
Application- HIT-V / HAS-U / HAS-E / HAS
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V / HAS-U / HAS-E / HAS - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-A V3 - CMU
Application- HIT-V / HAS-U / HAS-E / HAS
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- CMU
- Dry Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V / HAS-U / HAS-E / HAS - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-R V3 - Concrete
Application- HIT-V / HAS-U / HAS-E / HAS
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V / HAS-U / HAS-E / HAS - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-R V3 - CMU
Application- HIT-V / HAS-U / HAS-E / HAS
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- CMU
- Dry Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - floor and downwardly inclined installation - Diamond Core Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <220 mm [<8 1/2 inch]→ back to product selection
HIT-Z - floor and downwardly inclined installation - Diamond Core Drill - HIT-HY 200-R V3 - Concrete
→ Embedment Depth <220 mm [<8 1/2 inch]→ back to product selection
HIT-Z - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-R V3 - Concrete
→ Embedment Depth <220 mm [<8 1/2 inch]→ back to product selection
HIT-Z - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <220 mm [<8 1/2 inch]→ back to product selection
HIT-Z - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-A V3 - CMU
→ Embedment Depth <220 mm [<8 1/2 inch]→ back to product selection
HIT-Z - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-R V3 - CMU
→ Embedment Depth <220 mm [<8 1/2 inch]→ back to product selection
HIT-Z - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <220 mm [<8 1/2 inch]→ back to product selection
HIT-Z - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-A V3 - CMU
→ Embedment Depth <220 mm [<8 1/2 inch]→ back to product selection
HIT-Z - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-R V3 - Concrete
→ Embedment Depth <220 mm [<8 1/2 inch]→ back to product selection
HIT-Z - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-R V3 - CMU
→ Embedment Depth <220 mm [<8 1/2 inch]→ back to product selection
HIT-Z - horizontal and upwardly inclined installation - Diamond Core Drill - HIT-HY 200-A V3 - Concrete
Application- HIT-Z
- horizontal and upwardly inclined installation
- Diamond core drill
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-A V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Diamond Core Drill - HIT-HY 200-R V3 - Concrete
Application- HIT-Z
- horizontal and upwardly inclined installation
- Diamond core drill
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-R V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-A V3 - Concrete
Application- HIT-Z
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-A V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-A V3 - CMU
Application- HIT-Z
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- CMU
- Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Perform Installation
→HIT-Z / HIT-Z-R - CMU [imperial units]
→Curing Times HIT-Z / HIT-HY 200-A V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-R V3 - Concrete
Application- HIT-Z
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-R V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-R V3 - CMU
Application- HIT-Z
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- CMU
- Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Perform Installation
→HIT-Z / HIT-Z-R - CMU [imperial units]
→Curing Times HIT-Z / HIT-HY 200-R V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-A V3 - Concrete
Application- HIT-Z
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-A V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-A V3 - CMU
Application- HIT-Z
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- CMU
- Dry Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Perform Installation
→HIT-Z / HIT-Z-R - CMU [imperial units]
→Curing Times HIT-Z / HIT-HY 200-A V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-R V3 - Concrete
Application- HIT-Z
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-R V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-R V3 - CMU
Application- HIT-Z
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- CMU
- Dry Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Perform Installation
→HIT-Z / HIT-Z-R - CMU [imperial units]
→Curing Times HIT-Z / HIT-HY 200-R V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar - floor and downwardly inclined installation - Diamond Core Drill with roughening Tool - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - floor and downwardly inclined installation - Diamond Core Drill with roughening Tool - HIT-HY 200-R V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-A V3 - CMU
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-R V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-R V3 - CMU
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-A V3 - CMU
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-R V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-R V3 - CMU
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - horizontal and upwardly inclined installation - Diamond Core Drill with roughening Tool - HIT-HY 200-A V3 - Concrete
Application- Rebar
- horizontal and upwardly inclined installation
- Diamond coring with roughening with Hilti roughening tool TE-YRT
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of Installation
→Roughening Time
→Rebar CA / Diamond core bit [imperial units]
→Rebar US - Concrete / Diamond core bit [imperial units]
→Rebar / Diamond core bit [metric units]
Perform Installation
→Rebar CA / Diamond core bit [imperial units]
→Rebar US - Concrete / Diamond core bit [imperial units]
→Rebar / Diamond core bit [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar - horizontal and upwardly inclined installation - Diamond Core Drill with roughening Tool - HIT-HY 200-R V3 - Concrete
Application- Rebar
- horizontal and upwardly inclined installation
- Diamond coring with roughening with Hilti roughening tool TE-YRT
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of Installation
→Roughening Time
→Rebar CA / Diamond core bit [imperial units]
→Rebar US - Concrete / Diamond core bit [imperial units]
→Rebar / Diamond core bit [metric units]
Perform Installation
→Rebar CA / Diamond core bit [imperial units]
→Rebar US - Concrete / Diamond core bit [imperial units]
→Rebar / Diamond core bit [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-A V3 - Concrete
Application- Rebar
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation
→Rebar CA [imperial units]
→Rebar US - Concrete [imperial units]
→Rebar [metric units]
Perform Installation
→Rebar CA [imperial units]
→Rebar US - Concrete [imperial units]
→Rebar [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-A V3 - CMU
Application- Rebar
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- CMU
- Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation
→Rebar US - CMU [imperial units]
Perform Installation
→Rebar US - CMU [imperial units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-R V3 - Concrete
Application- Rebar
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation
→Rebar CA [imperial units]
→Rebar US - Concrete [imperial units]
→Rebar [metric units]
Perform Installation
→Rebar CA [imperial units]
→Rebar US - Concrete [imperial units]
→Rebar [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-R V3 - CMU
Application- Rebar
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- CMU
- Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation
→Rebar US - CMU [imperial units]
Perform Installation
→Rebar US - CMU [imperial units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-A V3 - Concrete
Application- Rebar
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling
→Rebar CA / Hollow drill bit [imperial units]
→Rebar US - Concrete / Hollow drill bit [imperial units]
→Rebar / Hollow drill bit [metric units]
Perform Installation
→Rebar CA / Hollow drill bit [imperial units]
→Rebar US - Concrete / Hollow drill bit [imperial units]
→Rebar / Hollow drill bit [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-A V3 - CMU
Application- Rebar
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- CMU
- Dry Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling
→Rebar US - CMU [imperial units]
Perform Installation
→Rebar US - CMU [imperial units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-R V3 - Concrete
Application- Rebar
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling
→Rebar CA / Hollow drill bit [imperial units]
→Rebar US - Concrete / Hollow drill bit [imperial units]
→Rebar / Hollow drill bit [metric units]
Perform Installation
→Rebar CA / Hollow drill bit [imperial units]
→Rebar US - Concrete / Hollow drill bit [imperial units]
→Rebar / Hollow drill bit [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-R V3 - CMU
Application- Rebar
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- CMU
- Dry Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling
→Rebar US - CMU [imperial units]
Perform Installation
→Rebar US - CMU [imperial units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hammer Drill Bit - HIT-HY 200-A V3 - Concrete - Water filled borehole
Application- HIT-V / HAS-U / HAS-E / HAS
- floor and downwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Water filled borehole in concrete
- Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation - Water filled borehole in concrete
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V - floor and downwardly inclined installation - Hollow Drill Bit - HIT-HY 200-A V3 - Concrete - Water filled borehole
Application- HIT-V / HAS-U / HAS-E / HAS
- floor and downwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Water filled borehole in concrete
- Embedment Depth <250 mm [<10 inch]
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Prepration of installation - water filled borehole in Concrete
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V - floor and downwardly inclined installation - Hammer Drill Bit - HIT-HY 200-R V3 - Concrete - Water filled borehole
Application- HIT-V / HAS-U / HAS-E / HAS
- floor and downwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Water filled borehole in concrete
- Embedment Depth <250 mm [<10 inch]
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation - Water filled borehole in concrete
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V - floor and downwardly inclined installation - Hollow Drill Bit - HIT-HY 200-R V3 - Concrete - Water filled borehole
Application- HIT-V / HAS-U / HAS-E / HAS
- floor and downwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Water filled borehole in concrete
- Embedment Depth <250 mm [<10 inch]
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Prepration of installation - water filled borehole in Concrete
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-A V3 - Concrete
→ Dry / Water saturated borehole→ Water filled borehole
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-A V3 - Concrete
→ Dry / Water saturated borehole→ Water filled borehole
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-R V3- Concrete
→ Dry / Water saturated borehole→ Water filled borehole
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-R V3 - Concrete
→ Dry / Water saturated borehole→ Water filled borehole
→ back to product selection
Rebar- floor and downwardly inclined installation - Hammer Drill Bit - HIT-HY 200-R V3 - Concrete - Water filled borehole
Application- Rebar
- floor and downwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Water filled borehole in concrete
- Embedment Depth <250 mm [<10 inch]
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation - Water filled borehole in concrete
→Rebar CA [imperial units]
→Rebar US - Concrete [imperial units]
→Rebar [metric units]
Perform installation
→Rebar CA [imperial units]
→Rebar US - Concrete [imperial units]
→Rebar [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar - floor and downwardly inclined installation - Hollow Drill Bit - HIT-HY 200-R V3 - Concrete - Water filled borehole
Application- Rebar
- floor and downwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Water filled borehole in concrete
- Embedment Depth <250 mm [<10 inch]
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Prepration of installation - water filled borehole in Concrete
→Rebar CA / Hollow drill bit [imperial units]
→Rebar US - Concrete / Hollow drill bit [imperial units]
→Rebar / Hollow drill bit [metric units]
Perform installation
→Rebar CA / Hollow drill bit [imperial units]
→Rebar US - Concrete / Hollow drill bit [imperial units]
→Rebar / Hollow drill bit [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-A V3 - Concrete
→ Dry / Water saturated borehole→ Water filled borehole
→ back to product selection
Rebar - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-A V3 - Concrete
→ Dry / Water saturated borehole→ Water filled borehole
→ back to product selection
Rebar - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-R V3- Concrete
→ Dry / Water saturated borehole→ Water filled borehole
→ back to product selection
Rebar - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-R V3 - Concrete
→ Dry / Water saturated borehole→ Water filled borehole
→ back to product selection
Rebar - floor and downwardly inclined installation - Hammer Drill Bit - HIT-HY 200-A V3 - Concrete - Water filled borehole
Application- Rebar
- floor and downwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Water filled borehole in concrete
- Embedment Depth <250 mm [<10 inch]
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation - Water filled borehole in concrete
→Rebar US - Concrete [imperial units]
→Rebar CA [imperial units]
→Rebar [metric units]
Perform installation
→Rebar US - Concrete [imperial units]
→Rebar CA [imperial units]
→Rebar [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar - floor and downwardly inclined installation - Hollow Drill Bit - HIT-HY 200-A V3 - Concrete - Water filled borehole
Application- Rebar
- floor and downwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Water filled borehole in concrete
- Embedment Depth <250 mm [<10 inch]
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Prepration of installation - water filled borehole in Concrete
→Rebar CA / Hollow drill bit [imperial units]
→Rebar US - Concrete / Hollow drill bit [imperial units]
→Rebar / Hollow drill bit [metric units]
Perform installation
→Rebar CA / Hollow drill bit [imperial units]
→Rebar US - Concrete / Hollow drill bit [imperial units]
→Rebar / Hollow drill bit [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-R V3- Concrete
→ Dry / Water saturated borehole→ Water filled borehole
→ back to product selection
Rebar - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-R V3 - Concrete
→ Dry / Water saturated borehole→ Water filled borehole
→ back to product selection
Rebar - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-A V3 - Concrete
→ Dry / Water saturated borehole→ Water filled borehole
→ back to product selection
Rebar - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-A V3 - Concrete
→ Dry / Water saturated borehole→ Water filled borehole
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hammer Drill Bit - HIT-HY 200-A V3 - Concrete - Water filled borehole
Application- HIT-V / HAS-U / HAS-E / HAS
- floor and downwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Water filled borehole in Concrete
- Embedment Depth ≥250 mm [≥10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation - Water filled borehole in concrete
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
Perform installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V - floor and downwardly inclined installation - Hollow Drill Bit - HIT-HY 200-A V3 - Concrete - Water filled borehole
Application- HIT-V / HAS-U / HAS-E / HAS
- floor and downwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Water filled borehole in Concrete
- Embedment Depth ≥250 mm [≥10 inch]
→Auxiliary Means Embedment Depth ≥250 mm [≥10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Prepration of installation - water filled borehole in Concrete
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
Perform installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V - floor and downwardly inclined installation - Hammer Drill Bit - HIT-HY 200-R V3 - Concrete - Water filled borehole
Application- HIT-V / HAS-U / HAS-E / HAS
- floor and downwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Water filled borehole in Concrete
- Embedment Depth ≥250 mm [≥10 inch]
→Auxiliary Means Embedment Depth ≥250 mm [≥10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation - Water filled borehole in concrete
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
Perform installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V - floor and downwardly inclined installation - Hollow Drill Bit - HIT-HY 200-R V3 - Concrete - Water filled borehole
Application- HIT-V / HAS-U / HAS-E / HAS
- floor and downwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Water filled borehole in Concrete
- Embedment Depth <250 mm [<10 inch]
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Prepration of installation - water filled borehole in Concrete
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar- floor and downwardly inclined installation - Hammer Drill Bit - HIT-HY 200-R V3 - Concrete - Water filled borehole
Application- Rebar
- floor and downwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Water filled borehole in Concrete
- Embedment Depth ≥250 mm [≥10 inch]
→Auxiliary Means Embedment Depth ≥250 mm [≥10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation - Water filled borehole in concrete
→Rebar CA [imperial units]
→Rebar US - Concrete [imperial units]
→Rebar [metric units]
Perform installation
→Rebar CA [imperial units]
→Rebar US - Concrete [imperial units]
→Rebar [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar - floor and downwardly inclined installation - Hollow Drill Bit - HIT-HY 200-R V3 - Concrete - Water filled borehole
Application- Rebar
- floor and downwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Water filled borehole in Concrete
- Embedment Depth ≥250 mm [≥10 inch]
→Auxiliary Means Embedment Depth ≥250 mm [≥10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Prepration of installation - water filled borehole in Concrete
→Rebar CA / Hollow drill bit [imperial units]
→Rebar US - Concrete / Hollow drill bit [imperial units]
→Rebar / Hollow drill bit [metric units]
Perform installation
→Rebar CA / Hollow drill bit [imperial units]
→Rebar US - Concrete / Hollow drill bit [imperial units]
→Rebar / Hollow drill bit [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar - floor and downwardly inclined installation - Hammer Drill Bit - HIT-HY 200-A V3 - Concrete - Water filled borehole
Application- Rebar
- floor and downwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Water filled borehole in Concrete
- Embedment Depth ≥250 mm [≥10 inch]
→Auxiliary Means Embedment Depth ≥250 mm [≥10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation - Water filled borehole in concrete
→Rebar US - Concrete [imperial units]
→Rebar CA [imperial units]
→Rebar [metric units]
Perform installation
→Rebar US - Concrete [imperial units]
→Rebar CA [imperial units]
→Rebar [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
Rebar - floor and downwardly inclined installation - Hollow Drill Bit - HIT-HY 200-A V3 - Concrete - Water filled borehole
Application- Rebar
- floor and downwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Water filled borehole in Concrete
- Embedment Depth ≥250 mm [≥10 inch]
→Auxiliary Means Embedment Depth ≥250 mm [≥10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Prepration of installation - water filled borehole in Concrete
→Rebar CA / Hollow drill bit [imperial units]
→Rebar US - Concrete / Hollow drill bit [imperial units]
→Rebar / Hollow drill bit [metric units]
Perform installation
→Rebar CA / Hollow drill bit [imperial units]
→Rebar US - Concrete / Hollow drill bit [imperial units]
→Rebar / Hollow drill bit [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-R V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - floor and downwardly inclined installation - Hollow Drill - HIT-HY 200-R V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
Rebar - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-R V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-A V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-V - floor and downwardly inclined installation - Hammer Drill - HIT-HY 200-R V3 - Concrete
→ Embedment Depth <250 mm [<10 inch]→ Embedment Depth ≥250 mm [≥10 inch]
→ back to product selection
HIT-HY 200-R V3 - Base material
→ Cracked and uncracked Concrete→ Grout-filled CMU
HIT-HY 200-R V3 - Concrete
Select Anchor HIT-HY 200-R V3 - Concrete → HIT-Z________________________________________________________
→ HIT-V / HAS / HAS-U / HAS-E
________________________________________________________
→ HIS-N
________________________________________________________
→ Rebar
HIT-HY 200-R V3 - Grout-filled CMU
Select Anchor HIT-HY 200-R V3 - CMU → HIT-Z________________________________________________________
→ HIT-V / HAS / HAS-U / HAS-E
________________________________________________________
→ HIS-N
________________________________________________________
→ Rebar
Select Anchor HIT-HY 200-R V3 - Concrete
→ HIT-Z________________________________________________________
→ HIT-V / HAS / HAS-U / HAS-E
________________________________________________________
→ HIS-N
________________________________________________________
→ Rebar
Select Anchor HIT-HY 200-R V3 - CMU
→ HIT-Z________________________________________________________
→ HIT-V / HAS / HAS-U / HAS-E
________________________________________________________
→ HIS-N
________________________________________________________
→ Rebar
HIT-Z - HIT-HY 200-R V3 - Concrete
→ floor and downwardly inclined installation________________________________________________________
→ horizontal and upwardly inclined installation
________________________________________________________
→ back to product selection
HIT-Z - HIT-HY 200-R V3 - CMU
→ floor and downwardly inclined installation________________________________________________________
→ horizontal and upwardly inclined installation
________________________________________________________
→ back to product selection
HIT-V / HAS-U - HIT-HY 200-R V3 - Concrete
→ floor and downwardly inclined installation________________________________________________________
→ horizontal and upwardly inclined installation
________________________________________________________
→ back to product selection
HIT-V / HAS-U - HIT-HY 200-R V3 - CMU
→ floor and downwardly inclined installation________________________________________________________
→ horizontal and upwardly inclined installation
________________________________________________________
→ back to product selection
HIS-N - HIT-HY 200-R V3 - Concrete
→ floor and downwardly inclined installation________________________________________________________
→ horizontal and upwardly inclined installation
________________________________________________________
→ back to product selection
HIS-N - HIT-HY 200-R V3 - CMU
→ floor and downwardly inclined installation________________________________________________________
→ horizontal and upwardly inclined installation
________________________________________________________
→ back to product selection
Rebar - HIT-HY 200-R V3 - Concrete
→ floor and downwardly inclined installation________________________________________________________
→ horizontal and upwardly inclined installation
________________________________________________________
→ back to product selection
Rebar - HIT-HY 200-R V3 - CMU
→ floor and downwardly inclined installation________________________________________________________
→ horizontal and upwardly inclined installation
________________________________________________________
→ back to product selection
HIT-Z - floor and downwardly inclined installation - HIT-HY 200-R V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-Z - floor and downwardly inclined installation - HIT-HY 200-R V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-V / HAS-U - floor and downwardly inclined installation - HIT-HY 200-R V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-V / HAS-U - floor and downwardly inclined installation - HIT-HY 200-R V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIS-N / HIS-RN - floor and downwardly inclined installation - HIT-HY 200-R V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIS-N / HIS-RN - floor and downwardly inclined installation - HIT-HY 200-R V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
Rebar - floor and downwardly inclined installation - HIT-HY 200-R V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
Rebar - floor and downwardly inclined installation - HIT-HY 200-R V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-Z - horizontal and upwardly inclined installation - HIT-HY 200-R V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-Z - horizontal and upwardly inclined installation - HIT-HY 200-R V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-V / HAS-U - horizontal and upwardly inclined installation - HIT-HY 200-R V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-V / HAS-U - horizontal and upwardly inclined installation - HIT-HY 200-R V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIS-N / HIS-RN - horizontal and upwardly inclined installation - HIT-HY 200-R V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIS-N / HIS-RN - horizontal and upwardly inclined installation - HIT-HY 200-R V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
Rebar - horizontal and upwardly inclined installation - HIT-HY 200-R V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
Rebar - horizontal and upwardly inclined installation - HIT-HY 200-R V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
Applications
HIT-Z
HIT-Z - horizontal and upwardly inclined installation - Diamond Core Drill - HIT-HY 200-A V3 - Concrete
Application- HIT-Z
- horizontal and upwardly inclined installation
- Diamond core drill
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-A V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Diamond Core Drill - HIT-HY 200-R V3 - Concrete
Application- HIT-Z
- horizontal and upwardly inclined installation
- Diamond core drill
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-R V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-A V3 - Concrete
Application- HIT-Z
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-A V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-A V3 - CMU
Application- HIT-Z
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- CMU
- Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Perform Installation
→HIT-Z / HIT-Z-R - CMU [imperial units]
→Curing Times HIT-Z / HIT-HY 200-A V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-R V3 - Concrete
Application- HIT-Z
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-R V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-R V3 - CMU
Application- HIT-Z
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- CMU
- Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Perform Installation
→HIT-Z / HIT-Z-R - CMU [imperial units]
→Curing Times HIT-Z / HIT-HY 200-R V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-A V3 - Concrete
Application- HIT-Z
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-A V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-A V3 - CMU
Application- HIT-Z
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- CMU
- Dry Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Perform Installation
→HIT-Z / HIT-Z-R - CMU [imperial units]
→Curing Times HIT-Z / HIT-HY 200-A V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-R V3 - Concrete
Application- HIT-Z
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-R V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-R V3 - CMU
Application- HIT-Z
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- CMU
- Dry Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Perform Installation
→HIT-Z / HIT-Z-R - CMU [imperial units]
→Curing Times HIT-Z / HIT-HY 200-R V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - horizontal and upwardly inclined installation - HIT-HY 200-A V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-Z - horizontal and upwardly inclined installation - HIT-HY 200-A V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-Z - horizontal and upwardly inclined installation - HIT-HY 200-R V3 - Concrete
→ Hammer drilling________________________________________________________
→ Diamond coring
________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-Z - horizontal and upwardly inclined installation - HIT-HY 200-R V3 - CMU
→ Hammer drilling________________________________________________________
→ Hollow drilling
________________________________________________________
→ back to product selection
HIT-Z - floor and downwardly inclined installation - Diamond Core Drill - Concrete
Application- HIT-Z
- floor and downwardly inclined installation
- Diamond core drill
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-A V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - floor and downwardly inclined installation - Diamond Core Drill - Concrete
Application- HIT-Z
- floor and downwardly inclined installation
- Diamond core drill
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-R V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - floor and downwardly inclined installation - Hammer Drill Bit - Concrete
Application- HIT-Z
- floor and downwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-A V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - floor and downwardly inclined installation - Hammer Drill Bit - CMU
Application- HIT-Z
- floor and downwardly inclined installation
- Hammer Drill Bit
- CMU
- Dry Concrete
Water Saturated Concrete
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Perform Installation
→HIT-Z / HIT-Z-R - CMU [imperial units]
→Curing Times HIT-Z / HIT-HY 200-A V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - floor and downwardly inclined installation - Hammer Drill Bit - Concrete
Application- HIT-Z
- floor and downwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-R V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - floor and downwardly inclined installation - Hammer Drill Bit - CMU
Application- HIT-Z
- floor and downwardly inclined installation
- Hammer Drill Bit
- CMU
- Dry Concrete
Water Saturated Concrete
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Perform Installation
→HIT-Z / HIT-Z-R - CMU [imperial units]
→Curing Times HIT-Z / HIT-HY 200-R V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - floor and downwardly inclined installation - Hollow Drill Bit - Concrete
Application- HIT-Z
- floor and downwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-A V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - floor and downwardly inclined installation - Hollow Drill Bit - CMU
Application- HIT-Z
- floor and downwardly inclined installation
- Hollow Drill Bit
- CMU
- Dry Concrete
Water Saturated Concrete
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Perform Installation
→HIT-Z / HIT-Z-R - CMU [imperial units]
→Curing Times HIT-Z / HIT-HY 200-A V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - floor and downwardly inclined installation - Hollow Drill Bit - Concrete
Application- HIT-Z
- floor and downwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
Perform Installation
→HIT-Z / HIT-Z-R - Concrete [imperial units]
→HIT-Z / HIT-Z-R [metric units]
→Curing Times HIT-Z / HIT-HY 200-R V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-Z - floor and downwardly inclined installation - Hollow Drill Bit - CMU
Application- HIT-Z
- floor and downwardly inclined installation
- Hollow Drill Bit
- CMU
- Dry Concrete
Water Saturated Concrete
→Auxiliary Means Embedment Depth <250 mm [<10 inch]
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling Pre-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Hole Drilling Through-Fastening
→HIT-Z / HIT-Z-R - CMU [imperial units]
Perform Installation
→HIT-Z / HIT-Z-R - CMU [imperial units]
→Curing Times HIT-Z / HIT-HY 200-R V3
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V / HAS-U
HIT-V / HAS-U / HAS-E / HAS - horizontal and upwardly inclined installation - Diamond Core Drill with roughening Tool - HIT-HY 200-A V3 - Concrete
Application- HIT-V / HAS-U / HAS-E / HAS
- horizontal and upwardly inclined installation
- Diamond coring with roughening with Hilti roughening tool TE-YRT
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of Installation
→Roughening Time
→HIT-V / HAS-U / HAS-E / HAS / Diamond core bit [imperial units]
→HIT-V / HAS-U / HAS-E / HAS / Diamond core bit [metric units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS / Diamond core bit [imperial units]
→HIT-V / HAS-U / HAS-E / HAS / Diamond core bit [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V / HAS-U / HAS-E / HAS- horizontal and upwardly inclined installation - Diamond Core Drill with roughening Tool - HIT-HY 200-R V3 - Concrete
Application- HIT-V / HAS-U / HAS-E / HAS
- horizontal and upwardly inclined installation
- Diamond coring with roughening with Hilti roughening tool TE-YRT
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of Installation
→Roughening Time
→HIT-V / HAS-U / HAS-E / HAS / Diamond core bit [imperial units]
→HIT-V / HAS-U / HAS-E / HAS / Diamond core bit [metric units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS / Diamond core bit [imperial units]
→HIT-V / HAS-U / HAS-E / HAS / Diamond core bit [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V / HAS-U / HAS-E / HAS - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-A V3 - Concrete
Application- HIT-V / HAS-U / HAS-E / HAS
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V / HAS-U / HAS-E / HAS - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-A V3 - CMU
Application- HIT-V / HAS-U / HAS-E / HAS
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- CMU
- Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V / HAS-U / HAS-E / HAS - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-R V3 - Concrete
Application- HIT-V / HAS-U / HAS-E / HAS
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V / HAS-U / HAS-E / HAS - horizontal and upwardly inclined installation - Hammer Drill Bit - HIT-HY 200-R V3 - CMU
Application- HIT-V / HAS-U / HAS-E / HAS
- horizontal and upwardly inclined installation
- Hammer Drill Bit
- CMU
- Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Preparation of installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→Curing Times HIT-HY 200-R V3 (excl. HIT-Z)
→ back to product selection
_______________________________________________________________________________________________________________________________________
HIT-V / HAS-U / HAS-E / HAS - horizontal and upwardly inclined installation - Hollow Drill Bit - HIT-HY 200-A V3 - Concrete
Application- HIT-V / HAS-U / HAS-E / HAS
- horizontal and upwardly inclined installation
- Hollow Drill Bit
- Cracked Concrete
Uncracked Concrete - Dry Concrete
Water Saturated Concrete
→Auxiliary Means
→Auxiliary Means [imperial units]
→Auxiliary Means [metric units]
→Order Numbers
Hole Drilling
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
Perform Installation
→HIT-V / HAS-U / HAS-E / HAS [imperial units]
→HIT-V / HAS-U / HAS-E / HAS [metric units]
→Curing Times HIT-HY 200-A V3 (excl. HIT-Z)
→ back to product selection