Hello,
I am trying to design a connection for secondary steel supported on concrete ground beams (report attached). Steel needs to be 120 minutes fire rated, so connection needs the same. I have no problem with ULS design, but Fire design has more than 1000% utilization ratio. I think that steel is a problem, not a concrete. ...